Shanghai 1,275 m² SAC Animal Facility Cleanroom

Completed in Shanghai in 2026, this 1,275 m² SAC animal facility cleanroom targets ISO 7 for biopharmaceutical research use.

This 1,275 m² animal-facility project was completed in Shanghai in 2026 for a confidential research institution. Its requirement was an ISO 7 clean environment suitable for biopharmaceutical research use. The selected SAC modular cleanroom approach allowed the enclosure to be assembled on site and arranged around the facility's functional areas. The delivery scope included cleanroom partition systems, cleanroom ceiling panels, HVAC and filtration, lighting, electrical services, automation, and monitoring. Installation, commissioning, and validation were also included in the project package. Working through these elements together is important in an animal facility, where room boundaries, environmental services, and access need to be coordinated with the operating layout. The recorded lead time was three months. This case shows how a site-assembled system can serve a research facility of moderate scale without presenting unverified claims about equipment, workflows, or achieved operating performance.

Shanghai 1,275 m² SAC Animal Facility Cleanroom
1,275 m² Area terkendali
3 months Pengiriman
ISO 7 Kelas cleanroom
01
TANTANGAN

Mengatasi Kendala Proyek Nyata

Create approximately 1,275 m² of ISO 7 clean space for an animal facility used in biopharmaceutical research.

02
SOLUSI

Direkayasa untuk Proses

A site-assembled SAC modular cleanroom was delivered for approximately 1,275 m² of ISO 7 animal-facility space in Shanghai.

LINGKUP PENGIRIMAN

Paket Cleanroom yang Terkoordinasi

Paket proyek dikoordinasikan sebagai sistem lengkap, menjaga antarmuka arsitektur, mekanis, dan kontrol tetap selaras dari desain hingga kualifikasi.

  • 01Site-assembled modular walls and ceiling for a 1,275 m² animal-facility cleanroom
  • 02HVAC and filtration serving the ISO 7 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site assembly, commissioning and validation