Pengiriman Cleanroom ke Seluruh Dunia
Beranda / Solusi / SAC · Studi Kasus
SAC · Studi Kasus

Changchun 25 m² SAC Automotive Components Cleanroom

Completed in Changchun in 2020, this compact 25 m² SAC cleanroom targets ISO 8 for automotive component operations.

This compact 25 m² cleanroom was completed in Changchun, China, in 2020 for automotive component operations. The project called for ISO 8 clean space within a limited footprint and a layout suitable for efficient assembly at the site. A SAC modular cleanroom configuration provided the enclosure, with cleanroom wall panels and a matching ceiling forming the controlled room. HVAC and filtration, lighting, electrical services, automation, and monitoring formed part of the coordinated package. The scope also included cleanroom installation, commissioning, and validation. For a space of this size, planning the equipment position and service interfaces matters because even small layout changes can affect usable room area. The recorded delivery period was one month. This case illustrates a site-assembled option for a focused industrial process, without implying a larger facility or any particular component technology beyond the information supplied for publication.

Changchun 25 m² SAC Automotive Components Cleanroom
25 m² Area terkendali
1 month Pengiriman
ISO 8 Kelas cleanroom
01
TANTANGAN

Mengatasi Kendala Proyek Nyata

Create a compact 25 m² ISO 8 clean space for automotive component operations with an efficient site-assembled layout.

02
SOLUSI

Direkayasa untuk Proses

A compact site-assembled SAC modular cleanroom provided 25 m² of ISO 8 space for automotive component operations in Changchun.

LINGKUP PENGIRIMAN

Paket Cleanroom yang Terkoordinasi

Paket proyek dikoordinasikan sebagai sistem lengkap, menjaga antarmuka arsitektur, mekanis, dan kontrol tetap selaras dari desain hingga kualifikasi.

  • 01Site-assembled modular walls and ceiling for a 25 m² automotive components cleanroom
  • 02HVAC and filtration serving the ISO 8 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site assembly, commissioning and validation
MULAI PROYEK ANDA

Merencanakan Cleanroom Serupa?

Sampaikan kebutuhan proses, klasifikasi, dan jadwal Anda. Tim kami akan merekomendasikan pendekatan PAC atau SAC yang tepat.